0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Mülmischtalbrücke
Beginning of works: 1986
Completion: 1988
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: High-speed rail bridge
Material: Prestressed concrete bridge
Structurae Plus/Pro - Subscribe Now!
Construction method: arch:
In-situ casting on falsework
Structure: main span:
Deck arch bridge
Material: main span:
Reinforced concrete bridge

Location

Location: , , ,
Part of:
Coordinates: 51° 10' 18.32" N    9° 32' 36.83" E
Show coordinates on a map

Technical Information

Dimensions

total length 870 m
height above valley floor or water 74 m
arch arch span 116 m
deck deck depth 5.3 m
deck width 14 m
number of spans 15
standard span lengths 58 m
piles length max. 33 m

Materials

deck prestressed concrete
piers reinforced concrete
arch reinforced concrete
abutments reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20010926
  • Published on:
    06/12/2003
  • Last updated on:
    23/04/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine