Clearwater Memorial Causeway

General Information

Other name(s): Memorial Causeway Bridge
Beginning of works: 2001
Completion: August 2005
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 27° 57' 56.89" N    82° 48' 17.51" W
Show coordinates on a map

Technical Information

Dimensions

main span 109.73 m
width 34.02 m
total length 774.19 m

Materials

deck precast prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Excerpt from Wikipedia

The Clearwater Memorial Causeway is a four-lane road between downtown Clearwater and Clearwater Beach, Florida, and includes a fixed-span bridge across the Intracoastal Waterway. It carries the State Road 60 designation and is known for its greenways and pedestrian walkways (and was designated as Great Florida Birding Trail several years ago) and elegant bridge appearance and structure. The road is also a major evacuation route during hurricane season.

History

The original Memorial Causeway Bridge was a two-lane flat span that opened in the 1920s. It connected downtown Clearwater and Clearwater Beach for nearly thirty-plus years until it was replaced by a bascule bridge in the 1950s. A portion of the original bridge was demolished with the remaining section kept open as a fishing pier.

Even though the bascule bridge served the needs of Clearwater through its entire lifespan, it became clear in the mid-1990s that a replacement span would be needed. Increasing boat traffic would raise the bridge numerous times throughout any given day, which proved to be especially dangerous when a line of westbound traffic exceeded the bridge approach and extended across the Pierce St. intersection. Many alternatives and designs were considered during the planning process, including concepts that ranged from a higher drawbridge to a miniature Sunshine Skyway-type bridge. The final design was chosen in 1998 and construction commenced in 2001. However, due to issues during the construction process, the bridge opened over a year behind schedule, finally receiving its first traffic in August 2005.

Text imported from Wikipedia article "Clearwater Memorial Causeway" and modified on 11 February 2021 according to the CC-BY-SA 3.0 license.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20017775
  • Published on:
    12/09/2005
  • Last updated on:
    12/01/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine