0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1986
Completion: 1987
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 22° 21' 4.13" N    114° 5' 52.08" E
Show coordinates on a map

Technical Information

Dimensions

main span 70 m
number of lanes 2 x 2

Materials

deck prestressed concrete
piers reinforced concrete

Notes

The bridge consists of a double box girder deck. Each box gider was launched incrementally from either side of the valley and stitched together in the middle to form a continuous structure.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20070985
  • Published on:
    11/03/2016
  • Last updated on:
    11/03/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine