Lister Damm Bridge

General Information

Beginning of works: June 1999
Completion: December 1999
Status: in use

Project Type

Structure: Unbraced tied-arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Address: Lister Damm
Crosses:
  • Mittellandkanal
Part of:
Replaces: Lister Damm Bridge (1912)
Coordinates: 52° 24' 17.96" N    9° 45' 15.31" E

Technical Information

Dimensions

arch span 58.82 m
total width 9.00 m

Cost

cost of construction German Mark 3 600 000

Materials

arch steel

Chronology

June 1999

Construction begins.

December 1999

Completion.

April 2000

Opened to traffic.

Participants

Structural engineering
Checking engineering
Main contractor
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20008704
  • Date created
    21/03/2003
  • Last Update
    20/07/2017