Dimensions
approach viaducts | ||
---|---|---|
total length | 183 m | |
main bridge | ||
arch | arch span | 305 m |
deck | height above valley floor or water | 113 m |
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
1962 |
award winner
for registered users |
---|
Location: |
Lewiston, Niagara County, New York, USA Queenston, Ontario, Canada |
---|---|
Crosses: |
|
Coordinates: | 43° 9' 10.77" N 79° 2' 40.02" W |
approach viaducts | ||
---|---|---|
total length | 183 m | |
main bridge | ||
arch | arch span | 305 m |
deck | height above valley floor or water | 113 m |
The longest hinge-less steel arch span in the world at the time it was built. Hardesty & Hanover won the AISC Design for Long Spans for this bridge. Structure comprises twin steel-box arches spanning 305m between abutments. The roadway rises 113m above the Niagara River with five box girder approach spans totaling approximately 183m flanking the main span.