• de
  • en
  • fr
  • International Database and Gallery of Structures

Lechbrücke Landsberg

General Information

Beginning of works: 1972
Completion: 1977
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,
Crosses:
  • Lech River
Carries:
  • Bundesstrasse B 12

Technical Information

Dimensions

main span 88 m
total length 264 m
horizontal radius of curvature 1 687 m
height above valley floor or water ca. 30 m
deck deck depth 4.50 m

Materials

deck prestressed concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20011011
  • Date created
    14/12/2003
  • Last Update
    05/02/2016