General Information
Name in local language: | 雪山隧道 (Xuěshān Suìdào) |
---|---|
Other name(s): | Pinglin Tunnel; Syueshan Tunnel; Xueshan Tunnel |
Beginning of works: | 1993 |
Completion: | 16 June 2006 |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
New Taipei City, Taiwan Yilan, Taiwan |
---|---|
Coordinates: | 24° 50' 51.92" N 121° 47' 28.32" E |
Coordinates: | 24° 56' 19.02" N 121° 42' 52.08" E |
Technical Information
Dimensions
number of tubes | 2 | |
tube 1 | length | 12 941 m |
tube 2 | length | 12 917 m |
Design Loads
design speed | 70-90 km/h |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Analysis of smoke movement in the Hsuehshan tunnel fire. In: Tunnelling and Underground Space Technology, v. 84 (February 2019), pp. 142-150. (2019):
- Analysis of the Hsuehshan Tunnel Fire in Taiwan. In: Tunnelling and Underground Space Technology, v. 69 (October 2017), pp. 108-115. (2017):
- An approach to assessing the hydraulic conductivity disturbance in fractured rocks around the Syueshan tunnel, Taiwan. In: Tunnelling and Underground Space Technology, v. 24, n. 2 (March 2009), pp. 222-230. (2009):
- About this
data sheet - Structure-ID
20010970 - Published on:
13/12/2003 - Last updated on:
18/01/2023