Haynes Inlet Slough Bridge

General Information

Beginning of works: 1999
Completion: 2004
Status: in use

Project Type

Location

Location: , , ,
Coordinates: 43° 26' 23.62" N    124° 13' 12.14" W
Show coordinates on a map

Technical Information

Dimensions

arches span 60.35 - 72.8 m
overall structure total length 235.61 m

Cost

cost of construction United States dollar 12 500 000

Materials

arches prestressed concrete
reinforcing stainless steel

Notes

The arches are cast in place and post-tensioned. The post tensioning was primarily to control stresses during construction stages, but there is permanent post tensioning to reduce flexure from long-term second order effects.

The stainless steel reinforcing is in the beams and deck only, and was not used in the arches, columns, pier diaphragms, or pile caps.

Advertisement

Participants

Owner
Engineers of Record
Contractor
Reinforcing steel

Relevant Web Sites

There currently are no relevant websites listed.