General Information
Project Type
Structure: |
Deck arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Structure: |
Two-hinged arch bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
North Bend, Coos County, Oregon, USA |
---|---|
Coordinates: | 43° 26' 23.62" N 124° 13' 12.14" W |
Technical Information
Dimensions
main span | 72.8 m | |
total length | 235.61 m | |
number of spans | 3 | |
number of lanes | 4 | |
arches | span lengths | 60.35 - 72.8 m |
Cost
cost of construction | United States dollar 12 500 000 |
Materials
arches |
prestressed concrete
|
---|---|
reinforcing |
stainless steel
|
Notes
The arches are cast in place and post-tensioned. The post tensioning was primarily to control stresses during construction stages, but there is permanent post tensioning to reduce flexure from long-term second order effects.
The stainless steel reinforcing is in the beams and deck only, and was not used in the arches, columns, pier diaphragms, or pile caps.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20011506 - Published on:
28/01/2004 - Last updated on:
05/02/2016