Hammecke Viaduct

General Information

Name in local language: Talbrücke Hammecke
Official designation: BW 186
Beginning of works: October 2012
Completion: July 2016
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Motorway bridge / freeway bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,
Coordinates: 51° 21' 57.23" N    8° 23' 23.04" E
Show coordinates on a map

Technical Information

Dimensions

total length 507.50 m
span lengths 40.00 m - 9 × 47.50 m - 40.00 m
deck width 28.60 m
bridge surface 14 464 m²
deck girder depth 3.42 m
number of lanes 2 x 2
roadway / carriageway width 2 x 11.50 m
piers P20, P30, P40, P60, P70, P90, P100, P110 diameter 2.00 m
piers P50, P80 width 3.60 m

Quantities

total length of piles 2 128 m
deck concrete volume 12 632 m³
prestressing steel 580 t
reinforcing steel 2 380 t
substructure structural steel 300 t
concrete volume 6 289 m³
reinforcing steel 775 t

Design Loads

live load LM1 (DIN FB 101)

Cost

cost of construction ca. Euro 17 100 000

Materials

deck prestressed concrete
piers concrete-filled steel tubes
reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20071823
  • Date created
    15/10/2016
  • Last Update
    16/02/2018