Advertisement

Share

Follow

Elbebrücke über den Elbeabstiegskanal

General Information

Official designation: BW 46
Beginning of works: November 1993
Completion: December 1997
Duration of works: 48 months
Status: in use

Project Type

Structure: Tied-arch bridge
Function / usage: Motorway bridge / freeway bridge
Material: Steel bridge

Location

Location: , ,
Crosses:
  • Mittellandkanal
Carries:
  • Autobahn A2
Part of:
Coordinates: 52° 13' 4.00" N    11° 40' 41.00" E
Show coordinates on a map

Technical Information

Dimensions

width 2 × 21.20 m
height 17.10 m
length 95.00 m
bridge surface 4 028 m²
arch rise 17.10 m
deck deck depth 2.40 m

Cost

cost of construction German Mark 16 800 000
cost of construction per m² German Mark 4 170.80

Materials

deck composite steel-reinforced concrete
arches steel

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20012113
  • Date created
    16/05/2004
  • Last Update
    05/02/2016