General Information
Official designation: | BW 46 |
---|---|
Beginning of works: | November 1993 |
Completion: | December 1997 |
Duration of works: | 48 months |
Status: | in use |
Project Type
Structure: |
Tied-arch bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Location
Location: |
Magdeburg, Saxony-Anhalt, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Coordinates: | 52° 13' 4" N 11° 40' 41" E |
Technical Information
Dimensions
width | 2 x 21.20 m | |
height | 17.10 m | |
length | 95.00 m | |
bridge surface | 4 028 m² | |
arch | rise | 17.10 m |
deck | deck depth | 2.40 m |
Cost
cost of construction | German Mark 16 800 000 | |
cost of construction per m² | German Mark 4 170.80 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
arches |
steel
|
Participants
Owner
Original design
Structural engineering
- Ingenieurbüro Meyer + Winter (superstructure)
- Schmitt Stumpf Frühauf und Partner Ingenieurgesellschaft im Bauwesen mbH (substructure)
Construction drawings
Checking engineering
- Knut Hering (checking engineer)
Steel construction
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 19-28.
- About this
data sheet - Structure-ID
20012113 - Published on:
16/05/2004 - Last updated on:
05/02/2016