Advertisement
Share
Follow
Dibamba River Bridge
General Information
Project Type
Structure: |
Triple T-section girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge |
Location
Technical Information
Dimensions
total length | 370 m | |
span lengths | 10 × 37 m |
Materials
girders |
precast prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Les grands ponts du monde: Hors d'Europe. Brissaud, Poitiers (France), pp. 21. (1990):
- About this
data sheet - Structure-ID
20006931 - Date created
28/11/2002 - Last Update
02/01/2018