Bremen-Neustadt Footbridge

General Information

Beginning of works: August 2005
Completion: December 2006
Duration of works: 16 months
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Autobahn A281
Part of:
Coordinates: 53° 4' 31.00" N    8° 45' 37.30" E
Show coordinates on a map

Technical Information

Dimensions

total length 105.38 m
span lengths 26.5 m - 29.118 m - 49.7 m
deck deck width 3.74 m
pylon height 30 m
weight 8 t

Quantities

substructure concrete volume 501 m³
reinforcing steel 32 t
superstructure structural steel 118 t

Cost

cost of construction Euro 1 570 000

Materials

pylon steel
deck steel
stay cables steel wire
railing wood