General Information
Beginning of works: | August 2005 |
---|---|
Completion: | December 2006 |
Duration of works: | 16 months |
Status: | in use |
Project Type
Function / usage: |
Bicycle and pedestrian bridge |
---|---|
Structure: |
Cable-stayed bridge with semi-fan system |
Material: |
Steel bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
2008 |
entry
for registered users |
---|
Location
Location: |
Bremen, Bremen, Germany |
---|---|
Crosses: |
|
Part of: | |
Coordinates: | 53° 4' 31" N 8° 45' 37.30" E |
Technical Information
Dimensions
total length | 105.38 m | |
span lengths | 26.5 m - 29.118 m - 49.7 m | |
number of spans | 3 | |
deck | deck width | 3.74 m |
pylon | height | 30 m |
weight | 8 t |
Quantities
substructure | concrete volume | 501 m³ |
reinforcing steel | 32 t | |
superstructure | structural steel | 118 t |
Cost
cost of construction | Euro 1 570 000 |
Materials
pylon |
steel
|
---|---|
deck |
steel
|
stay cables |
steel wire
|
railing |
wood
|
Participants
Owner
Client
Design
Architecture
- Ulf Sommer (architect)
Structural engineering
Checking engineering
- Ulrich Weyer (checking engineer)
Co-contractor
Construction management
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2008. Deutscher Bundes-Verlag, Cologne (Germany), ISBN 978-3-935064-54-5, 2008, pp. 53-63.
- About this
data sheet - Structure-ID
20023896 - Published on:
19/10/2006 - Last updated on:
05/04/2016