Advertisement

Share

Follow

Donate

B 76 Junction Bridge at Eutin

General Information

Name in local language: Kreuzungsbauwerk B 76 in Eutin
Official designation: 642
Completion: 1995
Status: in use

Project Type

Structure: T-section girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge

Location

Location: , , ,
Coordinates: 54° 7' 34.63" N    10° 34' 45.53" E
Show coordinates on a map

Technical Information

Dimensions

main span 31.09 m
total length 33.75 m
bridge surface 381 m²
crossing angle 75.99 gon
deck deck depth 1.40 - 1.70 m
deck width 12.75 m

Design Loads

live load Brückenklasse 60/30 (DIN 1072)

Cost

cost of construction German Mark 2 240 000
cost of construction per m² German Mark 5 880

Materials

substructure reinforced concrete
abutments prestressed concrete

Advertisement

Participants

Original design
Structural engineering
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20000784
  • Date created
    13/06/2000
  • Last Update
    02/01/2018