General Information
Name in local language: | Viadotto Genova San Giorgio; Viadotto Polcevera |
---|---|
Other name(s): | Polcevera Viaduct |
Beginning of works: | 15 April 2019 |
Completion: | 3 August 2020 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Genoa, Genova, Liguria, Italy |
---|---|
Address: | A10 |
Part of: | |
Replaces: |
Polcevera Viaduct (1967)
|
Coordinates: | 44° 25' 31.49" N 8° 53' 23.73" E |
Technical Information
Dimensions
total length | 1 067 m | |
number of spans | 19 | |
piers | number | 18 |
Quantities
structural steel | 15 000 t | |
concrete volume | 67 000 m³ | |
reinforcing steel | 9 000 t | |
excavated material | 80 000 m³ |
Materials
superstructure |
steel
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Chronology
1 October 2019 | The first section of the superstructure is put into place by crane. |
---|---|
3 August 2020 | Inauguration |
5 August 2020 | Opened to traffic |
Participants
Relevant Web Sites
Relevant Publications
- Un Anno di dati e analisi sul Genova San Giorgio. In: Strade e Autostrade, v. 25, n. 149 (September 2021), pp. 191-193. (2021):
- L'inaugurazione del nuovo ponte Genova San Giorgio. In: Strade e Autostrade, v. 24, n. 143 (September 2020), pp. 50-52. (2020):
- Requisiti prestazionali e criteri costruttivi del ponte Genova San Giorgio – quarta parte. In: Strade e Autostrade, v. 25, n. 148 (July 2021), pp. 40-47. (2021):
- Requisiti prestazionali e criteri costruttivi del ponte Genova San Giorgio – quinta parte. In: Strade e Autostrade, v. 25, n. 149 (September 2021), pp. 73-81. (2021):
- Requisiti prestazionali e criteri costruttivi del ponte Genova San Giorgio – sesta parte. In: Strade e Autostrade, v. 25, n. 150 (November 2021), pp. 82-87. (2021):
- About this
data sheet - Structure-ID
20078526 - Published on:
07/10/2019 - Last updated on:
18/04/2024