0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1949
Completion: 1958
Status: in use

Project Type

Location

Location: ,
Coordinates: 35° 0' 32.04" N    137° 38' 56.40" E
Show coordinates on a map

Technical Information

Dimensions

height 65 m
retained water volume 29 110 000 m³
crest length 245.9 m
dam volume 273 000 m³

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20041532
  • Published on:
    18/12/2008
  • Last updated on:
    05/01/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine