General Information
Name in local language: | Albulatunnel |
---|---|
Completion: | 1903 |
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) tunnel |
---|---|
Structure: |
Tunnel |
Location
Location: |
Bergün/Bravuogn, Bergün Filisur, Grisons, Switzerland Bever, Grisons, Switzerland |
---|---|
Part of: | |
Coordinates: | 46° 35' 15.56" N 9° 46' 42.57" E |
Coordinates: | 46° 33' 37.42" N 9° 50' 38.36" E |
Technical Information
Dimensions
length | 5 864 m |
Chronology
1 July 1903 | Inauguration of the line |
---|---|
2021 — 2022 | Refurbishment works |
Notes
At the end of refurbishment works (from 2022 on), it will be used as safety tunnel of Albula II Tunnel.
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- L'Albula bis. In: Strade e Autostrade, v. 22, n. 132 (November 2018), pp. 44-46. (2018):
- About this
data sheet - Structure-ID
20025576 - Published on:
05/12/2006 - Last updated on:
28/05/2021