0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Jerusalem Light Rail Bridge; Bridge of Strings
Beginning of works: 2005
Completion: 25 June 2008
Status: in use

Project Type

Location

Location: , ,
Coordinates: 31° 47' 20.29" N    35° 11' 59.71" E
Show coordinates on a map

Technical Information

Dimensions

main span 160 m
length 360 m
pylon height 118 m

Cost

cost of construction 246 000 000

Materials

pylon steel

Chronology

11 April 2007
— 12 April 2007

The first part of the structure is laid down in presence of the Prime Minister of Israle and Jerusalem's Mayor.

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20015437
  • Published on:
    07/03/2005
  • Last updated on:
    05/06/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine