General Information
Other name(s): | Third Wuhan Yangtze River Bridge |
---|---|
Beginning of works: | 1997 |
Completion: | September 2000 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with semi-fan system |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wuhan, Hubei, China |
---|---|
Crosses: |
|
Coordinates: | 30° 29' 39.80" N 114° 13' 46.46" E |
Coordinates: | 30° 28' 53.60" N 114° 14' 57.14" E |
Technical Information
Dimensions
total length | 3 856 m | |
span lengths of main bridge | 50 m - 180 m - 618 m - 180 m - 50 m |
Materials
deck of main bridge |
steel
|
---|---|
deck of approach viaduct |
concrete
|
Participants
Design
Structural engineering
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Pylon foundation design of Wuhan Bai Sha Zhou Bridge. Presented at: IABSE Colloquium: Foundations for major bridges - Design and construction, New Delhi, India 1999, pp. 197. (1999):
- About this
data sheet - Structure-ID
20006697 - Published on:
09/11/2002 - Last updated on:
05/02/2016