General Information
Other name(s): | Governor Malcolm Wilson–Tappan Zee Bridge |
---|---|
Completion: | 15 December 1955 |
Status: | demolished (2018) |
Project Type
Structure: |
Cantilever truss bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel bridge |
Structure: |
Through truss bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
1955 |
Honorable Mention
for registered users |
---|
Location
Location: |
Tarrytown, Greenburgh, Westchester County, New York, USA Nyack, Rockland County, New York, USA |
---|---|
Crosses: |
|
Replaced by: |
Governor Mario M. Cuomo Bridge (2018)
|
Coordinates: | 41° 4' 28.63" N 73° 55' 11.71" W |
Coordinates: | 41° 3' 57.47" N 73° 51' 56.66" W |
Technical Information
Dimensions
main span | 369.7 m | |
width | 27 m | |
total length | 4 882 m | |
vertical navigation clearance | 42 m |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
Chronology
6 October 2017 | After traffic is moved to the replacement bridge, this bridge is closed to all traffic awaiting demolition. |
---|
Participants
Initial construction
Owner
Structural engineering
Contractor
Monitoring
Monitoring equipment
Relevant Web Sites
Relevant Publications
- Deck demands. Replacement of the deck on the outer lanes on the Tappan Zee Bridge in New York State is set for completion this year. In: Bridge Design & Engineering, v. 15, n. 57 (4th Quarter 2009), pp. 78-79. (2009):
- Lightweight Concrete Deck or Tappan Zee Bridge. In: Journal of the American Concrete Institute (ACI Journal Proceedings), v. 55, n. 12 (December 1958), pp. 685-694. (1958):
- Les ponts du "New York Thruway": le viaduc soudé de Suffern et le pont de Tappan Zee, sur l'Hudson. In: La Technique des Travaux, v. 34, n. 1-2 (January 1958), pp. 55-63. (1958):
- Rehabilitation of Tappan Zee Bridge Using Precast Concrete Composite Deck Units. In: Transportation Research Record: Journal of the Transportation Research Board, v. 1696, n. 1 (January 2000), pp. 63-72. (2000):
- Second phase Tappan Zee redecking kicks off. In: Bridge Update, n. 93 (July 2010), pp. 2.
- About this
data sheet - Structure-ID
20000535 - Published on:
21/11/1999 - Last updated on:
27/03/2021