General Information
Other name(s): | Menai Straits Bridge |
---|---|
Beginning of works: | 1818 |
Completion: | 30 January 1826 |
Status: | in use |
Project Type
Structure: |
Chain suspension bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Iron bridge Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
2002 |
for registered users |
---|
Location
Location: |
Bangor, Gwynned, Wales, United Kingdom |
---|---|
Crosses: |
|
Next to: |
Britannia Bridge (1850)
|
Coordinates: | 53° 13' 12.54" N 4° 9' 47.52" W |
Technical Information
Dimensions
main span | 177 m | |
total length | 521 m | |
tower height | 46.6 m | |
clearance | 30 m |
Materials
deck |
wrought iron
|
---|---|
piers |
masonry
|
chains |
wrought iron
|
Chronology
1940 | The main suspended deck structure is replaced by an identical one made of steel. |
---|
Notes
The bridge deck suffered damage in 1839 in a strong gale. The deck was eventually replaced in 1893 using steel. The entire structure was rehabilitated in 1940.
Participants
Relevant Web Sites
Relevant Publications
- An Account of an Examination of the Menai Suspension Bridge. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 217, n. 1924-1 ( 1924), pp. 208-238. (1924):
- An Account of the Repairs and Alterations made in the Structure of the Menai Bridge, in consequence of the damage it received during the gale of January 7, 1839.. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 1, n. 1841 ( 1841), pp. 58-59. (1841):
- Architects + Engineers = Structures. Academy Editions, New York (USA), pp. 23. :
- L'architecture et les ingénieurs. Deux siècles de réalisations. Moniteur, Paris (France), pp. 131. (1997):
- L'art de l'ingénieur. constructeur, entrepeneur, inventeur. Éditions du Centre Georges Pompidou, Paris (France), pp. 291-293. (1997):
- About this
data sheet - Structure-ID
20000091 - Published on:
28/10/1998 - Last updated on:
24/06/2022