• de
  • en
  • fr
  • International Database and Gallery of Structures

Proyecto y construcción del túnel de Guadarrama

Author(s):


Medium: journal article
Language(s): es 
Issue: Revista de Obras Públicas", , n. 3426, v. 149
Abstract:

The article describes the background of this tunnel right up to the adopted solution of a 28.4 km base tunnel under the Sierra de Guadarrama. The design consists of two independent tubes with an 8.50 m internal diameter, spaced 30 m between centrelines and with cross passages. The tunnels pass through igneous and metamorphic rock formations, predominantly formed by gneiss (62%) and granites (23%) and entail numerous structural problems due to the tectonics of the area. The tunnels will be bored by 4 "double shield" tunnelling machines and the assembly of the TBMs has recently been started and the main tunnel is now expected to be completed in 2005.

Structures and Projects

  • About this
    data sheet
  • Reference-ID
    10005054
  • Date created
    02/02/2003
  • Last Update
    13/08/2014