0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2002
Completion: 2007
Status: in use

Project Type

Structure: Tunnel
Function / usage: High-speed rail tunnel
Construction method: Tunnel boring machine (TBM)

Location

Location: ,
, ,
Part of:
Coordinates: 40° 46' 34.37" N    3° 46' 25.59" W
Coordinates: 40° 54' 6.23" N    4° 4' 15.69" W
Show coordinates on a map

Technical Information

Dimensions

interior diameter 8.50 m
excavation diameter 9.45 m
eastern tube total length 28 418.66 m
western tube length 28 407.70 m

Materials

tunnel structure reinforced concrete

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20007961
  • Published on:
    02/02/2003
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine