The Vidourle Viaduct
|
Détails bibliographiques
Auteur(s): |
Yi Zhang
(Spie Batignolles TPCI, Boulogne-Billancourt, France)
Dominique Regallet (OC’VIA Construction, Nîmes, France) Sylvain Boireau (SECOA-ARTELIA, Nanterre, France) Christian Charpin (Zwahlen & Mayr, Aigle, Switzerland) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018 | ||||
Publié dans: | IABSE Symposium Nantes 2018 | ||||
|
|||||
Page(s): | S20-11 | ||||
Nombre total de pages (du PDF): | 8 | ||||
DOI: | 10.2749/nantes.2018.s20-11 | ||||
Abstrait: |
The Vidourle Viaduct is an iconic structure on the Nîmes-Montpellier Bypass (Contournement Nîmes-Montpellier or CNM in French), the first dual track, mixed traffic high speed railway line (HSL) in France. The viaduct is 159 metres long and 14.1 metres wide, and consists of one Warren main bridge and two half-through access bridges. The aesthetic features of the viaduct were designed by Alain Spielmann’ architectural office. This paper describes its structural design, structural analyses and construction methods. |