0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Jiang, Shan / Ling, Florence Yean Yng / Ma, Guofeng (2024): Fostering Resilience in Project Teams: Adaptive Structuration Perspective. Dans: Journal of Management in Engineering (ASCE), v. 40, n. 1 (janvier 2024).

    https://doi.org/10.1061/jmenea.meeng-5615

  2. Wang, Ding / Jia, Jianyao / Jiang, Shan / Liu, Tianyi / Ma, Guofeng (2023): How Team Voice Contributes to Construction Project Performance: The Mediating Role of Project Learning and Project Reflexivity. Dans: Buildings, v. 13, n. 7 (28 juin 2023).

    https://doi.org/10.3390/buildings13071599

  3. Ma, Guofeng / Ding, Haoran (2023): Semi-Supervised Random Forest Methodology for Fault Diagnosis in Air-Handling Units. Dans: Buildings, v. 13, n. 1 (13 janvier 2023).

    https://doi.org/10.3390/buildings13010014

  4. Wang, Ding / Jia, Jianyao / Jiang, Shan / Liu, Tianyi / Ma, Guofeng (2022): Differential effects of contextual factors on promotive and prohibitive voice in construction projects: a multiteam system perspective. Dans: Engineering, Construction and Architectural Management, v. 31, n. 3 (décembre 2022).

    https://doi.org/10.1108/ecam-03-2022-0264

  5. Liu, Tianyi / Ma, Guofeng / Wang, Ding (2022): Pathways to successful building green retrofit projects: Causality analysis of factors affecting decision making. Dans: Energy and Buildings, v. 276 (décembre 2022).

    https://doi.org/10.1016/j.enbuild.2022.112486

  6. Jiang, Shan / Wei, Xiaokun / Jia, Jianyao / Ma, Guofeng (2022): Toward sustaining the development of green residential buildings in China: A tripartite evolutionary game analysis. Dans: Building and Environment, v. 223 (septembre 2022).

    https://doi.org/10.1016/j.buildenv.2022.109466

  7. Wu, Zhijiang / Ma, Guofeng (2022): Automatic generation of BIM-based construction schedule: combining an ontology constraint rule and a genetic algorithm. Dans: Engineering, Construction and Architectural Management, v. 30, n. 10 (août 2022).

    https://doi.org/10.1108/ecam-12-2021-1105

  8. Wu, Zhijiang / Ma, Guofeng (2022): Incremental cost-benefit quantitative assessment of green building: A case study in China. Dans: Energy and Buildings, v. 269 (août 2022).

    https://doi.org/10.1016/j.enbuild.2022.112251

  9. Jiang, Shan / Ma, Guofeng / Jia, Jianyao / Wu, Ming / Wu, Zhijiang (2022): Mobile ICT Overuse in the Construction Industry: Effects on Job Burnout of Project Managers. Dans: Journal of Construction Engineering and Management, v. 148, n. 6 (juin 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002274

  10. Ma, Guofeng / Wu, Zhijiang / Wu, Ming / Shang, Shanshan (2021): A hybrid method for matching analysis of construction project characteristics with operation and maintenance requirements. Dans: Engineering, Construction and Architectural Management, v. 29, n. 8 (juillet 2021).

    https://doi.org/10.1108/ecam-01-2021-0061

  11. Jia, Jianyao / Ma, Guofeng / Wu, Zhijiang / Wu, Ming / Jiang, Shan (2021): Unveiling the Impact of Task Conflict on Construction Project Performance: Mediating Role of Knowledge Integration. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 6 (novembre 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000963

  12. Ma, Guofeng / Wang, Yuqi / Jiang, Shan (2021): Optimization of Building Exit Layout: Combining Exit Decisions of Evacuees. Dans: Advances in Civil Engineering, v. 2021 (janvier 2021).

    https://doi.org/10.1155/2021/6622661

  13. Ma, Guofeng / Jiang, Shan / Wang, Ding (2021): Understanding the effects of social media use on construction project performance: a project manager's perspective. Dans: Engineering, Construction and Architectural Management, v. 29, n. 1 (avril 2021).

    https://doi.org/10.1108/ecam-12-2020-1014

  14. Ma, Guofeng / Liu, Tianyi / Shang, Shanshan (2021): Improving the climate adaptability of building green retrofitting in different regions: A weight correction system for Chinese national standard. Dans: Sustainable Cities and Society, v. 69 (juin 2021).

    https://doi.org/10.1016/j.scs.2021.102843

  15. Ma, Guofeng / Wu, Ming / Jia, Jianyao / Yang, Wenjing (2021): Two-Level Quality Decision Support System for Building Structural Damage Prediction and Maintenance Solution Recommendation in the Operation and Maintenance Phase. Dans: Journal of Construction Engineering and Management, v. 147, n. 6 (juin 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002051

  16. Jia, Jianyao / Ma, Guofeng / Jiang, Shan / Wu, Ming / Wu, Zhijiang (2021): Influence of social media use at work on construction managers' work performance: the knowledge seeker's perspective. Dans: Engineering, Construction and Architectural Management, v. 28, n. 10 (février 2021).

    https://doi.org/10.1108/ecam-09-2020-0705

  17. Ma, Guofeng / Wu, Ming / Wu, Zhijiang / Yang, Wenjing (2021): Single-shot multibox detector- and building information modeling-based quality inspection model for construction projects. Dans: Journal of Building Engineering, v. 38 (juin 2021).

    https://doi.org/10.1016/j.jobe.2021.102216

  18. Ma, Guofeng / Jia, Jianyao / Ding, Jiyong / Wu, Ming / Wang, Ding (2021): Examining the Impact of Social Media Use on Project Management Performance: Evidence from Construction Projects in China. Dans: Journal of Construction Engineering and Management, v. 147, n. 3 (mars 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002009

  19. Ma, Guofeng / Lin, Jing / Li, Nan / Zhou, Junjie (2017): Cross-cultural assessment of the effectiveness of eco-feedback in building energy conservation. Dans: Energy and Buildings, v. 134 (janvier 2017).

    https://doi.org/10.1016/j.enbuild.2016.11.008

  20. Ma, Guofeng / Lin, Jing / Li, Nan (2018): Longitudinal assessment of the behavior-changing effect of app-based eco-feedback in residential buildings. Dans: Energy and Buildings, v. 159 (janvier 2018).

    https://doi.org/10.1016/j.enbuild.2017.11.019

  21. Ma, Guofeng / Liu, Xiaoye (2020): Model and Algorithm for Dependent Activity Schedule Optimization Combining with BIM. Dans: Advances in Civil Engineering, v. 2020 (janvier 2020).

    https://doi.org/10.1155/2020/9727256

  22. Ma, Guofeng / Du, Qingjuan (2020): Structural health evaluation of the prestressed concrete using advanced acoustic emission (AE) parameters. Dans: Construction and Building Materials, v. 250 (juillet 2020).

    https://doi.org/10.1016/j.conbuildmat.2020.118860

  23. Ma, Guofeng / Song, Xue / Shang, Shanshan (2019): BIM-Based Space Management System for Operation and Maintenance Phase in Educational Office Building. Dans: Journal of Civil Engineering and Management, v. 0, n. 0 (22 août 2019).

    https://doi.org/10.3846/jcem.2019.11565

  24. Ma, Guofeng / Wu, Zhijiang (2020): BIM-based building fire emergency management: Combining building users' behavior decisions. Dans: Automation in Construction, v. 109 (janvier 2020).

    https://doi.org/10.1016/j.autcon.2019.102975

  25. Ma, Guofeng / Jiang, Jun / Shang, Shanshan (2019): Visualization of Component Status Information of Prefabricated Concrete Building Based on Building Information Modeling and Radio Frequency Identification: A Case Study in China. Dans: Advances in Civil Engineering, v. 2019 ( 2019).

    https://doi.org/10.1155/2019/6870507

  26. Ma, Guofeng / Zhang, Lingzhi (2019): Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling. Dans: Advances in Civil Engineering, v. 2019 ( 2019).

    https://doi.org/10.1155/2019/9120795

  27. Ma, Guofeng / Wang, Aimin / Li, Nan / Gu, Lingyun / Ai, Qi (2014): Improved Critical Chain Project Management Framework for Scheduling Construction Projects. Dans: Journal of Construction Engineering and Management, v. 140, n. 12 (décembre 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000908

  28. Ma, Guofeng / Gu, Lingyun / Li, Nan (2015): Scenario-Based Proactive Robust Optimization for Critical-Chain Project Scheduling. Dans: Journal of Construction Engineering and Management, v. 141, n. 10 (octobre 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0001003

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine