Guijun Luo
- Horizontal response of existing pile induced by adjacent shield tunnelling with large longitudinal slope. Dans: Tunnelling and Underground Space Technology, v. 153 (novembre 2024). (2024):
- (2021): Risk Assessment of Shield Tunnel Construction in Karst Strata Based on Fuzzy Analytic Hierarchy Process and Cloud Model. Dans: Shock and Vibration, v. 2021 (janvier 2021).
- (2022): Research on the Reuse of Discharged Soil from EBP Shield Tunnels in Synchronous Grouting Material. Dans: Advances in Civil Engineering, v. 2022 (janvier 2022).