Chun Huang
- Integrated reinforcement and imitation learning for tower crane lift path planning. Dans: Automation in Construction, v. 165 (septembre 2024). (2024):
- Discretized Cell Modeling for Optimal Layout of Multiple Tower Cranes. Dans: Journal of Construction Engineering and Management, v. 149, n. 8 (août 2023). (2023):
- Application maturity evaluation of building steel structure welding robotic technology based on multi-level gray theory. Dans: Engineering, Construction and Architectural Management. :
- Optimization of multiple-crane service schedules in overlapping areas through consideration of transportation efficiency and operational safety. Dans: Automation in Construction, v. 127 (juillet 2021). (2021):
- Optimization of Vertical Elevator Movements and Material Storage Locations for High-Rise Building Construction with Overtime Cost Effects. Dans: Journal of Computing in Civil Engineering, v. 33, n. 1 (janvier 2019). (2019):
- An experimental study on the lateral pressure of fresh concrete in formwork. Dans: Construction and Building Materials, v. 111 (mai 2016). (2016):
- Optimization of crane setup location and servicing schedule for urgent material requests with non-homogeneous and non-fixed material supply. Dans: Automation in Construction, v. 89 (mai 2018). (2018):