Optimization of multiple-crane service schedules in overlapping areas through consideration of transportation efficiency and operational safety
Auteur(s): |
Chun Huang
Wenjie Li Weisheng Lu Fan Xue Meng Liu Zhansheng Liu |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, juillet 2021, v. 127 |
Page(s): | 103716 |
DOI: | 10.1016/j.autcon.2021.103716 |
- Informations
sur cette fiche - Reference-ID
10607667 - Publié(e) le:
15.05.2021 - Modifié(e) le:
15.05.2021