Optimization of crane setup location and servicing schedule for urgent material requests with non-homogeneous and non-fixed material supply
Auteur(s): |
Chun Huang
C. K. Wong |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, mai 2018, v. 89 |
Page(s): | 183-198 |
DOI: | 10.1016/j.autcon.2018.01.015 |
- Informations
sur cette fiche - Reference-ID
10191052 - Publié(e) le:
01.12.2018 - Modifié(e) le:
01.12.2018