Daehie Hong
- Robot-based construction automation: An application to steel beam assembly (Part II). Dans: Automation in Construction, v. 32 (juillet 2013). (2013):
- Robot-based construction automation: An application to steel beam assembly (Part I). Dans: Automation in Construction, v. 32 (juillet 2013). (2013):
- GA-based fuzzy controller design for tunnel ventilation systems. Dans: Automation in Construction, v. 17, n. 2 (janvier 2008). (2008):
- A robotic system for road lane painting. Dans: Automation in Construction, v. 17, n. 2 (janvier 2008). (2008):
- The study on the integrated control system for curtain wall building façade cleaning robot. Dans: Automation in Construction, v. 94 (octobre 2018). (2018):