0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

G. Edward Gibson ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Aramali, Vartenie / Gibson, G. Edward / El Asmar, Mounir / Sanboskani, Hala (2023): Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance. Dans: Journal of Construction Engineering and Management, v. 149, n. 6 (juin 2023).

    https://doi.org/10.1061/jcemd4.coeng-12985

  2. Gibson, G. Edward / El Asmar, Mounir / Yussef, Abdulrahman / Ramsey, David (2023): A novel approach for measuring the accuracy of front end engineering design. Dans: Engineering, Construction and Architectural Management, v. 31, n. 7 (avril 2023).

    https://doi.org/10.1108/ecam-05-2022-0418

  3. Gibson, G. Edward / Sanboskani, Hala / El Asmar, Mounir / Aramali, Vartenie (2022): Employing Technology to Enable Remote Research Charrettes as a Method for Engaging Industry and Uncovering Best Practices: A Novel Approach for a Post-COVID-19 World. Dans: Journal of Construction Engineering and Management, v. 148, n. 11 (novembre 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002375

  4. Aramali, Vartenie / Sanboskani, Hala / Gibson, G. Edward / El Asmar, Mounir / Cho, Namho (2022): Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 3 (mai 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001019

  5. Aramali, Vartenie / Gibson, G. Edward / El Asmar, Mounir / Cho, Namho (2021): Earned Value Management System State of Practice: Identifying Critical Subprocesses, Challenges, and Environment Factors of a High-Performing EVMS. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 4 (juillet 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000925

  6. El Asmar, Mounir / Ramsey, David / Gibson, G. Edward / Bearup, Wylie (2020): Design-Build for Transportation Projects: Cost and Schedule Change Performance Analysis. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 1 (février 2020).

    https://doi.org/10.1061/(asce)la.1943-4170.0000335

  7. Goetz, J. Cletus / Gibson, G. Edward (2009): Construction Litigation, U.S. General Services Administration, 1980–2004. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 1 (février 2009).

    https://doi.org/10.1061/(asce)1943-4162(2009)1:1(40)

  8. Grajek, Kenneth M. / Gibson, G. Edward / Tucker, Richard L. (2000): Partnered Project Performance in Texas Department of Transportation. Dans: Journal of Infrastructure Systems, v. 6, n. 2 (juin 2000).

    https://doi.org/10.1061/(asce)1076-0342(2000)6:2(73)

  9. Yussef, Abdulrahman / Gibson, G. Edward / El Asmar, Mounir / Ramsey, David (2020): Industry Survey for Determining the State of Practice of Front End Engineering Design for Industrial Construction. Dans: Practice Periodical on Structural Design and Construction, v. 25, n. 4 (novembre 2020).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000504

  10. ElZomor, Mohamed / Burke, Rebekah / Parrish, Kristen / Gibson, G. Edward (2018): Front-End Planning for Large and Small Infrastructure Projects: Comparison of Project Definition Rating Index Tools. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 4 (juillet 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000611

  11. Collins, Wesley / Parrish, Kristen / Gibson, G. Edward (2017): Development of a Project Scope Definition and Assessment Tool for Small Industrial Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000514

  12. Bingham, Evan / Gibson, G. Edward (2017): Infrastructure Project Scope Definition Using Project Definition Rating Index. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 2 (mars 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000483

  13. Matthews, Benjamin / Sylvie, Jonathan R. / Lee, Sang-Hoon / Thomas, Stephen R. / Chapman, Robert E. / Gibson, G. Edward (2006): Addressing Security in Early Stages of Project Life Cycle. Dans: Journal of Management in Engineering (ASCE), v. 22, n. 4 (octobre 2006).

    https://doi.org/10.1061/(asce)0742-597x(2006)22:4(196)

  14. Weston, David C. / Gibson, G. Edward (1993): Partnering‐Project Performance in U.S. Army Corps of Engineers. Dans: Journal of Management in Engineering (ASCE), v. 9, n. 4 (octobre 1993).

    https://doi.org/10.1061/(asce)9742-597x(1993)9:4(410)

  15. Bingham, Evan / Gibson, G. Edward / El Asmar, Mounir (2019): Identifying Team Selection and Alignment Factors by Delivery Method for Transportation Projects. Dans: Journal of Construction Engineering and Management, v. 145, n. 10 (octobre 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001704

  16. Jung, Youngsoo / Gibson, G. Edward (1999): Planning for Computer Integrated Construction. Dans: Journal of Computing in Civil Engineering, v. 13, n. 4 (octobre 1999).

    https://doi.org/10.1061/(asce)0887-3801(1999)13:4(217)

  17. Gibson, G. Edward / Whittington, Donald A. (2010): Charrettes as a Method for Engaging Industry in Best Practices Research. Dans: Journal of Construction Engineering and Management, v. 136, n. 1 (janvier 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000079

  18. LeBlond, David / Owen, Frank / Gibson, G. Edward / Haas, Carl T. / Traver, Al E. (1998): Control Improvement for Advanced Construction Equipment. Dans: Journal of Construction Engineering and Management, v. 124, n. 4 (juillet 1998).

    https://doi.org/10.1061/(asce)0733-9364(1998)124:4(289)

  19. Anderson, Stuart D. / Patil, Shekhar S. / Gibson, G. Edward / Sullivan, George R. (2004): Owner–Contractor Work Structures: Process Approach. Dans: Journal of Construction Engineering and Management, v. 130, n. 5 (octobre 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:5(680)

  20. Bingham, Evan / Gibson, G. Edward / El Asmar, Mounir (2018): Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests. Dans: Journal of Construction Engineering and Management, v. 144, n. 6 (juin 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001469

  21. Caldas, Carlos H. / Gibson, G. Edward / Weerasooriya, Runi / Yohe, Angela M. (2009): Identification of Effective Management Practices and Technologies for Lessons Learned Programs in the Construction Industry. Dans: Journal of Construction Engineering and Management, v. 135, n. 6 (juin 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000011

  22. Hale, Darren R. / Shrestha, Pramen P. / Gibson, G. Edward / Migliaccio, Giovanni C. (2009): Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods. Dans: Journal of Construction Engineering and Management, v. 135, n. 7 (juillet 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000017

  23. Tucker, Richard L. / O'Connor, James T. / Gatton, Thomas M. / Gibson, G. Edward / Haas, Carl T. / Hudson, David N. (1994): The Impact of Computer Technology on Construction's Future. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (janvier 1994).

    https://doi.org/10.1111/j.1467-8667.1994.tb00357.x

  24. Kim, Kyong Ju / Gibson, G. Edward (1999): A development of knowledge-embedded, modularized simulation modeling system for heavy construction operations. Dans: KSCE Journal of Civil Engineering, v. 3, n. 3 (septembre 1999).

    https://doi.org/10.1007/bf02823811

  25. Kim, K. J. / Gibson, G. Edward (2003): Interactive simulation modeling for heavy construction operations. Dans: Automation in Construction, v. 12, n. 1 (janvier 2003).

    https://doi.org/10.1016/s0926-5805(02)00048-1

  26. Kilian, Jeffrey J. / Gibson, G. Edward (2005): Construction Litigation for the U.S. Naval Facilities Engineering Command, 1982–2002. Dans: Journal of Construction Engineering and Management, v. 131, n. 9 (septembre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:9(945)

  27. Cho, Chung-Suk / Gibson, G. Edward (2001): Building Project Scope Definition Using Project Definition Rating Index. Dans: Journal of Architectural Engineering (ASCE), v. 7, n. 4 (décembre 2001).

    https://doi.org/10.1061/(asce)1076-0431(2001)7:4(115)

  28. Griffith, Andrew F. / Gibson, G. Edward / Hamilton, Michele R. / Tortora, Aniello L. / Wilson, Charles T. (1999): Project Success Index for Capital Facility Construction Projects. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 13, n. 1 ( 1999).

    https://doi.org/10.1061/(asce)0887-3828(1999)13:1(39)

  29. Shrestha, Pramen P. / O'Connor, James T. / Gibson, G. Edward (2012): Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects. Dans: Journal of Construction Engineering and Management, v. 138, n. 1 (janvier 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000390

  30. Le, Tiendung / Caldas, Carlos H. / Gibson, G. Edward / Thole, Michael (2009): Assessing Scope and Managing Risk in the Highway Project Development Process. Dans: Journal of Construction Engineering and Management, v. 135, n. 9 (septembre 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000052

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine