Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry
Auteur(s): |
Vartenie Aramali
Hala Sanboskani G. Edward Gibson Mounir El Asmar Namho Cho |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Management in Engineering (ASCE), mai 2022, n. 3, v. 38 |
DOI: | 10.1061/(asce)me.1943-5479.0001019 |
- Informations
sur cette fiche - Reference-ID
10658024 - Publié(e) le:
17.02.2022 - Modifié(e) le:
17.02.2022