P. J. Edwards
- Risk and risk management in construction: a review and future directions for research. Dans: Engineering, Construction and Architectural Management, v. 5, n. 4 (avril 1998). (1998):
- Client briefing processes and procurement method selection: a South African study. Dans: Engineering, Construction and Architectural Management, v. 6, n. 2 (février 1999). (1999):
- Perceptions of positive and negative factors influencing the attractiveness of PPP/PFI procurement for construction projects in the UK. Findings from a questionnaire survey. Dans: Engineering, Construction and Architectural Management, v. 12, n. 2 (avril 2005). (2005):
- An investigation of wind-energy prospects in the Otago region of New Zealand. Dans: Journal of Wind Engineering and Industrial Aerodynamics, v. 5, n. 3-4 (mai 1980). (1980):
- Perceptions of Time, Cost and Quality Management on Building Projects. Dans: Australasian Journal of Construction Economics and Building, v. 2, n. 2 (novembre 2002). (2002):
- Critical success factors for PPP/PFI projects in the UK construction industry. Dans: Construction Management and Economics, v. 23, n. 5 (juin 2005). (2005):
- Cost modelling and price forecasting: practice and theory in perspective. Dans: Construction Management and Economics, v. 3, n. 3 (décembre 1985). (1985):
- A price-rationalized approach to item separation in the measurement of concrete work. Dans: Construction Management and Economics, v. 13, n. 6 (novembre 1995). (1995):