- Avoiding Disputes in PPP Road Contracts: Quantifying Impacts of Increased Allowable Truck Loads. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (mai 2023). (2023):
- Decision-Aid Frameworks for Earned Value Measurement or Assessment by the Construction Contract Engineer. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 3 (août 2021). (2021):
- Models for the Administration of Structured Construction Contract Notices. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 3 (août 2017). (2017):
- Classification and Analysis of Notice Requirements for Construction Contract Administration. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 3 (août 2017). (2017):
- Progression Analysis of the EJCDC’s Underlying Claim and Dispute Resolution Mechanism. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (août 2018). (2018):
- Multilayered Framework for Testing the Justifiability of Time-at-Large Callings. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (août 2018). (2018):
- Particularized Analysis of AIA’s Expeditious Mechanisms for Administering Claims and Disputes. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (août 2018). (2018):
- Sequencing and Operational Variations of Standard Claim and Dispute Resolution Mechanisms. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 3 (août 2019). (2019):
- Liability Exposure and Indemnity for Architecture and Engineering Professionals Acting as Independent Consultants or Design Subcontractors. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 11, n. 4 (novembre 2019). (2019):
- Pivotal New Roles and Changes Introduced by the 2017 FIDIC’s Claim and Dispute Resolution Mechanism. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 1 (février 2020). (2020):
- Architect and Engineer’s Spectrum of Engagement under Alternative Delivery Methods: Agreement Negotiation and Formation Implications. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 1 (février 2020). (2020):
- Timing of Liquidated Damages Recovery and Related Liability Issues. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (mai 2020). (2020):
- Legal Perspective on Treatment of Delay Liquidated Damages and Penalty Clauses by Different Jurisdictions: Comparative Analysis. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 2 (mai 2020). (2020):
- Considerations for Filing Global Construction Claims: Legal Perspective. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 3 (août 2020). (2020):
- BIM-Enabled Streaming of Changes and Potential Claims Induced by Fast-Tracking Design-Build Projects. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 1 (février 2021). (2021):
- Design information release under alternative design-construction modes. Dans: Engineering, Construction and Architectural Management, v. 28, n. 4 ( 2021). (2021):