Decision-Aid Frameworks for Earned Value Measurement or Assessment by the Construction Contract Engineer
Auteur(s): |
Farah Demachkieh
Mohamed-Asem Abdul-Malak |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, août 2021, n. 3, v. 13 |
Page(s): | 04521014 |
DOI: | 10.1061/(asce)la.1943-4170.0000481 |
- Informations
sur cette fiche - Reference-ID
10610533 - Publié(e) le:
08.06.2021 - Modifié(e) le:
08.06.2021