Timing of Liquidated Damages Recovery and Related Liability Issues
Auteur(s): |
Rayan Assaad
(Formerly, Graduate Student, Engineering Management Program, Maroun Semaan Faculty of Engineering and Architecture, American Univ. of Beirut, Bechtel Engineering Bldg., Beirut 1107 2020, Lebanon.)
Mohamed-Asem Abdul-Malak |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, mai 2020, n. 2, v. 12 |
Page(s): | 04520015 |
DOI: | 10.1061/(asce)la.1943-4170.0000390 |
- Informations
sur cette fiche - Reference-ID
10580013 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021