Avoiding Disputes in PPP Road Contracts: Quantifying Impacts of Increased Allowable Truck Loads
Auteur(s): |
Rana Haj Chhadeh
Ghassan Chehab Mohamed-Asem Abdul-Malak |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, mai 2023, n. 2, v. 15 |
DOI: | 10.1061/jladah.ladr-911 |
- Informations
sur cette fiche - Reference-ID
10715597 - Publié(e) le:
21.03.2023 - Modifié(e) le:
21.03.2023