Predicting the construction projects time and cost overruns using K-nearest neighbor and artificial neural network: a case study from Jordan
Auteur(s): |
Ahmad Arabiat
Hamza Al-Bdour Majdi Bisharah |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Asian Journal of Civil Engineering, avril 2023, n. 7, v. 24 |
Page(s): | 2405-2414 |
DOI: | 10.1007/s42107-023-00649-7 |