Optimum Calculation Method for Cable Force of Concrete-Filled Steel Tube Arch Bridge in Inclined Cable-Stayed Construction
Auteur(s): |
Yang Li
(E-mail address:)
Jiang-long Wang Su-su Ge |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Highway and Transportation Research and Development (English Edition), mars 2017, n. 1, v. 11 |
Page(s): | 42-48 |
DOI: | 10.1061/jhtrcq.0000549 |
- Informations
sur cette fiche - Reference-ID
10589391 - Publié(e) le:
08.03.2021 - Modifié(e) le:
19.04.2023