Integrated Simulation System for Construction Operation and Project Scheduling
Auteur(s): |
Dong-Eun Lee
Chang-Yong Yi Tae-Kyung Lim David Arditi |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Computing in Civil Engineering, novembre 2010, n. 6, v. 24 |
Page(s): | 557-569 |
DOI: | 10.1061/(asce)cp.1943-5487.0000061 |
- Informations
sur cette fiche - Reference-ID
10259594 - Publié(e) le:
29.12.2018 - Modifié(e) le:
29.12.2018