0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Li, Fangxin / Yi, Chang-Yong / Li, Qiongfang / Chi, Hung-Lin / Kim, Min-Koo (2024): Data quality-oriented scan planning for steel structure scenes using a probabilistic genetic algorithm. Dans: Automation in Construction, v. 167 (novembre 2024).

    https://doi.org/10.1016/j.autcon.2024.105700

  2. Lee, Dong-Eun / Choi, Young / Hong, Geuntae / Maruthi, M. / Yi, Chang-Yong / Park, Young- Jun (2024): Parametric Image-Based Concrete Defect Assessment Method. Dans: Case Studies in Construction Materials, v. 20 (juillet 2024).

    https://doi.org/10.1016/j.cscm.2024.e02962

  3. Yi, Chang-Yong / Li, Fangxin / Thedja, Julian Pratama Putra / Sim, Sung-Han / Choi, Yoon-ki / Kim, Geon Hwee / Kim, Min-Koo (2024): A Comparison Study of Edge Line Estimation Algorithms for Dimensional Quality Assessment of Precast Concrete Slabs. Dans: Advances in Civil Engineering, v. 2024 (janvier 2024).

    https://doi.org/10.1155/2024/4166203

  4. Kim, Jong-Hwan / Park, Young-Jun / Yi, Chang-Yong / Lee, Dong-Eun (2023): Stochastic flame locating method hybridizing Kalman filter and deep neural network for rapid fire response at construction sites. Dans: Journal of Building Engineering, v. 66 (mai 2023).

    https://doi.org/10.1016/j.jobe.2023.105967

  5. Lee, Hyung-Guk / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2015): An Advanced Stochastic Time-Cost Tradeoff Analysis Based on a CPM-Guided Genetic Algorithm. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 30, n. 10 (juin 2015).

    https://doi.org/10.1111/mice.12148

  6. Lim, Tae-Kyung / Yi, Chang-Yong / Lee, Dong-Eun / Arditi, David (2014): Concurrent Construction Scheduling Simulation Algorithm. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 29, n. 6 (mars 2014).

    https://doi.org/10.1111/mice.12073

  7. Yi, Chang-Yong / Gwak, Han-Seong / Lee, Dong-Eun (2017): Stochastic Carbon Emission Estimation Method for Construction Operation. Dans: Journal of Civil Engineering and Management, v. 23, n. 1 (janvier 2017).

    https://doi.org/10.3846/13923730.2014.992466

  8. Lee, Dong-Eun / Yi, Chang-Yong / Lim, Tae-Kyung / Arditi, David (2010): Integrated Simulation System for Construction Operation and Project Scheduling. Dans: Journal of Computing in Civil Engineering, v. 24, n. 6 (novembre 2010).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000061

  9. Gwak, Han-Seong / Yi, Chang-Yong / Lee, Dong-Eun (2016): Stochastic Optimal Haul-Route Searching Method Based on Genetic Algorithm and Simulation. Dans: Journal of Computing in Civil Engineering, v. 30, n. 3 (mai 2016).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000496

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine