Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study
Auteur(s): |
Marcus Jefferies
Rod Gameson Steve Rowlinson |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management, avril 2002, n. 4, v. 9 |
Page(s): | 352-361 |
DOI: | 10.1108/eb021230 |
- Informations
sur cette fiche - Reference-ID
10575892 - Publié(e) le:
26.02.2021 - Modifié(e) le:
26.02.2021