Engineering, Construction and Architectural Management - v. 9, n. 4 (avril 2002)
Publié: | avril 2002 |
---|
Articles dans ce numéro
Auteur(s) | Titre | Page(s) |
---|---|---|
Mrad, Fuad / Asem Abdul-Malak, M. / Sadek, Salah / Khudr, Ziad | Automated excavation in construction using robotics trajectory and envelop generation | 325-335 |
Psilander, Kurt | Axiomatic design in the customizing home building industry | 318-324 |
Jefferies, Marcus / Gameson, Rod / Rowlinson, Steve | Critical success factors of the BOOT procurement system: reflections from the Stadium Australia case study | 352-361 |
Ugwu, O. O. / Tah, J. H. M. | Development and application of a hybrid genetic algorithm for resource optimization and management | 304-317 |
Potts, Keith / Wall, Mike | Managing the commissioning of building services | 336-344 |
Love, Peter E. D. / Holt, Gary D. / Li, Heng | Triangulation in construction management research | 294-303 |
Wild, Alan | The unmanageability of construction and the theoretical psycho‐social dynamics of projects | 345-351 |