General Information
Other name(s): | Talbrücke Zschopau |
---|---|
Official designation: | BW 1 [Talübergang Zschopau] |
Beginning of works: | 1994 |
Completion: | 1996 |
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Zschopau, Erzgebirgskreis, Saxony, Germany |
---|---|
Crosses: |
|
Carries: |
|
Coordinates: | 50° 44' 32.40" N 13° 3' 42.71" E |
Technical Information
Dimensions
main span | 121.00 m | |
total length | 407.70 m | |
bridge surface | 11 619 m² | |
deck | deck width | 28.50 m |
Cost
cost of construction | German Mark 30 400 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutment |
reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
- König Heunisch und Partner
- Gert König (checking engineer)
Co-contractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 1997. Verkehrsblatt-Verlag, Dortmund (Germany), 1997, pp. 83-94.
- Neubau der Talbrücke Zschopau im Freivorbau. Presented at: 6. Dresdner Brückenbausymposium, Dresden, 14. März 1996. (1996):
- About this
data sheet - Structure-ID
20000765 - Published on:
07/06/2000 - Last updated on:
05/02/2016