0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: April 2016
Completion: 29 June 2017
Status: in use

Project Type

Location

Location: , , ,
Crosses: A 9 Motorway (Germany)
Coordinates: 51° 42' 27.35" N    12° 12' 44.09" E
Show coordinates on a map

Technical Information

Dimensions

total length 63.50 m
span lengths 11.00 m - 42.00 m - 11.00 m
number of spans 3
bridge surface 1 038 m²
arches width 1.00 m
depth 0.90 - 1.42 m
deck deck width 16.35 m
number of lanes 2 x 2
roadway / carriageway width 12.75 m

Quantities

substructure concrete volume 1 300 m³
reinforcing steel 180 t
superstructure structural steel 516 t
concrete volume 475 m³
reinforcing steel 120 t

Design Loads

design code(s) DIN EN 1991-2/NA

Cost

cost of construction Euro 3 660 000

Materials

arches steel
deck slab reinforced concrete
abutments reinforced concrete
main girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20077335
  • Published on:
    30/04/2019
  • Last updated on:
    30/04/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine