General Information
Other name(s): | Zhengzhou-Jiaozuo Intercity Railway Yellow River Bridge |
---|---|
Beginning of works: | October 2010 |
Completion: | 26 May 2014 |
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Structure: |
Through truss bridge |
Material: |
Steel bridge |
Support conditions: |
for registered users |
Structure: |
Non-parallel chord truss bridge |
Function / usage: |
High-speed rail bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Zhengzhou, Henan, China |
---|---|
Crosses: |
|
Coordinates: | 34° 57' 49.57" N 113° 31' 21.87" E |
Technical Information
Dimensions
total length | 9 630 m | |
number of tracks | 2 x 2 | |
main bridge | ||
---|---|---|
total length | 2 200 m |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20085896 - Published on:
19/05/2023 - Last updated on:
21/05/2023