General Information
Completion: | 1995 |
---|---|
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Function / usage: |
Road bridge |
Structure: |
Box girder bridge |
Location
Location: |
Castelo Branco, Portugal Pedrógão Grande, Leiria, Portugal |
---|---|
Crosses: |
|
Coordinates: | 39° 54' 15.58" N 8° 8' 22.76" W |
Technical Information
Dimensions
main span | 180 m | |
height above valley floor or water | 150 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20052466 - Published on:
01/02/2010 - Last updated on:
05/02/2016