0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Citadelbrug
Beginning of works: 2014
Completion: 2016
Status: in use

Project Type

Location

Location: , ,
Coordinates: 51° 51' 34.40" N    5° 50' 57.54" E
Show coordinates on a map

Technical Information

Dimensions

length 210 m
number of spans 7
piers number 6

Cost

cost of construction Euro 4 700 000

Materials

deck reinforced concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Owner
Architecture
Structural engineering
Co-contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20067361
  • Published on:
    18/07/2015
  • Last updated on:
    11/12/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine